The milestones of our healthcare journey from 1990 to the present.
From 1990 to today
INSTITUTIONAL MEMORY
From a temporary facility to an international medical center
Inonu University Faculty of Medicine Research Hospital began service in 1990. The foundation of Turgut Ozal Medical Center was laid one year later, and the center opened its doors in 1996 after five years of construction.
Located on Inonu University campus in Malatya, the center continues to grow with advanced diagnostic and treatment units, organ and bone marrow transplantation services, intensive care infrastructure and regional responsibility.
Capacity through the years1996–2026
Bed capacity at opening on 14 October 1996: 110. The 1996 table row shows year-end capacity.
Annual bed and operating room capacity
Year
Total beds
Intensive care beds
Operating rooms
2026
1,360
276
39
2025
1,607
316
39
2024
1,607
316
39
2023
1,607
316
39
2022
1,607
316
39
2021
1,607
316
39
2020
1,585
295
39
2019
1,363
295
39
2018
1,363
295
39
2017
1,359
289
39
2016
1,339
286
39
2015
1,222
248
26
2014
1,222
248
26
2013
1,168
238
26
2012
1,027
227
26
2011
1,017
222
20
2010
914
142
20
2009
914
120
20
2008
891
120
20
2007
889
120
20
2006
800
120
16
2005
715
99
16
2004
693
99
16
2003
690
99
16
2002
685
95
16
2001
630
50
10
2000
630
50
10
1999
578
40
10
1998
573
40
6
1997
340
20
6
1996
316
—
4
Intensive care beds are included in the total. A dash indicates that a value was not specified in the annual record.
MILESTONES
TÖTM through the years
The key stages of our institutional development.
011990
Healthcare services began
Inonu University Faculty of Medicine Research Hospital began serving patients in temporary buildings belonging to the State Hospital.
021991
The foundation was laid
Construction of Turgut Ozal Medical Center, one of Türkiye's most comprehensive healthcare investments of its time, began.
031996
The new center opened with 110 beds
Turgut Ozal Medical Center opened on 14 October 1996 at a ceremony attended by President Süleyman Demirel. Initial capacity was 110 beds, including intensive care. Total capacity reached 316 beds by the end of the year.
041997
Emergency and intensive care services expanded
The emergency department opened and three ambulances were acquired. Intensive care capacity reached 20 beds, and a seven-bed dialysis unit entered service.
052001
Bone marrow transplantation began
Five bone marrow transplants were performed during the year. Infrastructure preparations began for liver and kidney transplantation.
062002
The first liver transplant was performed
The center performed its first deceased-donor liver transplant. The number of operating rooms increased to 16, and the physical therapy unit entered service.
072005
Living-donor liver transplantation began
The hospital performed its first living-donor liver transplant. The laboratory animal research center opened.
082006
Kidney transplantation began
Kidney transplant surgery began. The molecular diagnostic laboratory introduced HLA tissue typing for kidney and bone marrow transplant patients.
092007
A new era in quality management
A quality directive and quality policy were established. The sleep disorders center and endoscopy, central sterilization, pediatric audiometry and dermocosmetology units entered service.
102008
Electronic archiving was introduced
The hospital information system was renewed and electronic archiving was introduced.
112012–2014
Integrated management systems
Occupational health and safety, environmental, food safety and customer satisfaction management systems were gradually integrated into the hospital.
122013
The foundation of the Liver Transplant Hospital was laid
Construction of the Liver Transplant Hospital began. The center performed a liver transplant for its 1,000th patient, and emergency intermediate care and medical intensive care services opened.
132015
An unrelated-donor bone marrow transplant was performed
The hospital performed the region’s first unrelated-donor bone marrow transplant.
142016
Liver Transplant Hospital opened
The new hospital building supporting the center's extensive liver transplantation experience was completed and entered service.
152017
New treatment units entered service
Construction of the Oncology Hospital began. A LINAC device, the Traditional and Complementary Medicine Center and the Pediatric Bone Marrow Transplant Unit entered service.
162019
Simultaneous transplants and new patient support facilities
Five patients received simultaneous liver transplants on the same day. Seven patients received bone marrow transplants in one day. The Dr. Nihal Vardı Pediatric Surgery Ward and a second guesthouse opened.
172020
The Oncology Hospital opened
The Oncology Hospital opened with 217 beds across 31,590 square meters. New facilities were provided for oncology, hematology, stem cell and bone marrow treatment, intensive care and radioactive iodine therapy.
182023
Healthcare continued during the earthquake period
Following the earthquakes on 6 February, the hospital continued providing services across its departments. The energy center and other parts of the buildings sustained earthquake damage.
192024
The energy center and hospital facilities were renewed
The heavily damaged energy center was renewed. Repairs, repainting and surface renewals were carried out throughout the hospital, and a play area opened in the pediatric hematology ward.
202025
Patient service facilities were improved
Renovation of the emergency department began and part of the air-conditioning infrastructure was renewed. An antenatal education service opened, and a children’s playground was added to the pediatric outpatient area.
212026
Emergency and dialysis facilities were expanded and renewed
The adult emergency department expanded from 600 to 2,450 square meters, with triage and green, yellow and red zones. An emergency laboratory and negative-pressure room opened. Dialysis moved to new premises in the Oncology Hospital with individual patient spaces, and a reading room and library opened for students.